Road Construction in Pokhara and Gandaki Province
Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.

Nepal Construction Knowledge
Practical guides, calculators, market references and construction knowledge for Nepal.
Featured Guides
Start with practical guidance on roads, gabion and masonry, BOQ and final bills, and equipment-supported work.

Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.

How gabion and stone masonry works are planned, constructed, measured, and quality-checked for roads, slopes, drains, and river protection in Nepal.

A practical overview of BOQ items, joint measurement, running bills, variations, as-built records, reconciliation, and final bill preparation in Nepal.

A useful house budget starts with measured floor area, a defined construction scope and current written quotations. This 2083/84 guide publishes no verified market rate.

JCB is a brand name. In everyday usage, many customers use “JCB” to refer to a backhoe loader. Confirm the actual machine, task and availability before booking.

Material prices are useful only with a date, specification, unit and delivery basis. This hub explains how to collect comparable quotations; no current market prices are verified here.
Resource Library
Find practical guidance for your next project. Filter by topic or by the kind of work you do.
50 resources

Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.

How gabion and stone masonry works are planned, constructed, measured, and quality-checked for roads, slopes, drains, and river protection in Nepal.

Planning and execution of canal upgradation in Nepal, including flow diversion, excavation, lining, structural repair, outlets, measurement, and QA/QC.

A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.

Safe planning for landslide clearance, roadway excavation, spoil management, drainage, gabion, masonry, and slope protection on Nepal hill roads.

How contractors plan procurement, records, cash flow, rate exposure, and contract compliance when bitumen, fuel, cement, steel, and aggregates rise in price.

A practical overview of BOQ items, joint measurement, running bills, variations, as-built records, reconciliation, and final bill preparation in Nepal.
An overview of Nepal e-GP tender preparation and post-award contract execution: eligibility, bid security, BOQ, programme, compliance, measurement, and records.

A practical QA/QC checklist for earthworks, sub-grade, sub-base, drainage, masonry, gabion, concrete, reinforcement, bitumen, records, and handover.

A useful house budget starts with measured floor area, a defined construction scope and current written quotations. This 2083/84 guide publishes no verified market rate.

A per-sq-ft rate is comparable only when floor-area measurement, specifications and exclusions match. Use it as a budget cross-check alongside an itemized BOQ.

“2.5 storeys” does not define the roof-floor area or structural quantities. Budget full floors and the actual partial floor separately, then add roof and site works.