Aggregate Price in Pokhara: Size, Grading and Delivered Cost
Aggregate price comparisons need the same size range, grading, source and unit. Confirm the material specification before comparing delivered totals.

Aggregate price comparisons need the same size range, grading, source and unit. Confirm the material specification before comparing delivered totals.
Published by: Jwala Nirman Sewa
Practical context: construction execution, measurement, BOQ and infrastructure-work experience in Nepal.
Editorial review:
Specify the material before pricing
“10 mm” and “20 mm” are not universal alternatives for every concrete element. The mix requirements, reinforcement spacing and placement method influence selection. Road base material also has its own grading and quality requirements; do not substitute concrete aggregate by name alone.
Check delivery and acceptance
Ask how the quantity is measured and whether delivery includes unloading. Keep size fractions separated, avoid soil contamination and inspect delivery records. Converting mass to volume requires an appropriate material density and state, not an assumed universal conversion.
Worked planning example
Before requesting a quotation
Practical checklist
- Ask for a dated written quotation with quantity and unit.
- Confirm VAT, transport, unloading and quote validity.
- Retain source and acceptance records.
Note: Actual work should follow the signed contract, approved drawings, BOQ, specifications, authorized engineer’s instructions, and applicable public-procurement and safety requirements.
Frequently Asked Questions
Can road-base aggregate be used directly in RCC?
Only if it meets the approved concrete specification and acceptance requirements. A common source does not establish equivalence.
Related Resources
Related Resources
Road Construction in Pokhara and Gandaki Province
Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.
Read guideGabion Wall and Stone Masonry Works in Nepal
How gabion and stone masonry works are planned, constructed, measured, and quality-checked for roads, slopes, drains, and river protection in Nepal.
Read guideIrrigation Canal Upgradation Works in Nepal
Planning and execution of canal upgradation in Nepal, including flow diversion, excavation, lining, structural repair, outlets, measurement, and QA/QC.
Read guideRoad Upgrading Process: Excavation, Sub-base, Drainage and Bitumen Works
A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.
Read guideLandslide Clearance and Hill Road Protection Works in Nepal
Safe planning for landslide clearance, roadway excavation, spoil management, drainage, gabion, masonry, and slope protection on Nepal hill roads.
Read guideHow Contractors Manage Price Rise in Bitumen, Fuel and Construction Materials
How contractors plan procurement, records, cash flow, rate exposure, and contract compliance when bitumen, fuel, cement, steel, and aggregates rise in price.
Read guide