Technical Guide

Road & Infrastructure7 min read

Photography updated:

Road Construction in Pokhara and Gandaki Province

Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.

Premix paving work at Jaldhare

Road work in Gandaki must account for steep terrain, monsoon water, variable soil, settlement access, and material haul distance. A workable construction plan starts with survey control and drainage—not surfacing.

Published by: Jwala Nirman Sewa

Practical context: construction execution, measurement, BOQ and infrastructure-work experience in Nepal.

Typical execution sequence

The approved drawing, BOQ, chainage, formation width, levels, and disposal locations should be confirmed before bulk excavation.

Practical checklist

  • Survey and setting out
  • Excavation and road formation
  • Side drains, cross-drainage, and protection works
  • Sub-grade preparation, sub-base and base compaction
  • Prime/tack coat, premix or specified bituminous layer, and finishing

Quality and measurement controls

Layer thickness, moisture, compaction, line and level, drain dimensions, masonry workmanship, and bitumen temperature/application must follow the specification and engineer’s direction. Running bills should be supported by joint measurement and site records.

People carrying out a pavement site check at Jaldhare
A closer view of the related site activity.

Note: Actual work should follow the signed contract, approved drawings, BOQ, specifications, authorized engineer’s instructions, and applicable public-procurement and safety requirements.

Frequently Asked Questions

What usually causes road failure in hill areas?

Uncontrolled water, weak compaction, unsuitable fill, inadequate slope protection, and delayed maintenance are common causes.

Should bitumen work continue during rain?

Generally no. The surface and weather conditions must satisfy the project specification and supervising engineer.

Related Resources

Related Resources

Gabion / Retaining / Slope Protection

Gabion Wall and Stone Masonry Works in Nepal

How gabion and stone masonry works are planned, constructed, measured, and quality-checked for roads, slopes, drains, and river protection in Nepal.

Read guide
Road & Infrastructure

Irrigation Canal Upgradation Works in Nepal

Planning and execution of canal upgradation in Nepal, including flow diversion, excavation, lining, structural repair, outlets, measurement, and QA/QC.

Read guide
Road & Infrastructure

Road Upgrading Process: Excavation, Sub-base, Drainage and Bitumen Works

A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.

Read guide
Road & Infrastructure

Landslide Clearance and Hill Road Protection Works in Nepal

Safe planning for landslide clearance, roadway excavation, spoil management, drainage, gabion, masonry, and slope protection on Nepal hill roads.

Read guide
Construction Materials & Prices

How Contractors Manage Price Rise in Bitumen, Fuel and Construction Materials

How contractors plan procurement, records, cash flow, rate exposure, and contract compliance when bitumen, fuel, cement, steel, and aggregates rise in price.

Read guide
BOQ / Billing / Contracts

BOQ, Measurement and Final Bill Process in Nepal Construction Contracts

A practical overview of BOQ items, joint measurement, running bills, variations, as-built records, reconciliation, and final bill preparation in Nepal.

Read guide