Technical Guide

Gabion / Retaining / Slope Protection6 min read

Photography updated:

Gabion Wall and Stone Masonry Works in Nepal

How gabion and stone masonry works are planned, constructed, measured, and quality-checked for roads, slopes, drains, and river protection in Nepal.

Rock-filled gabion baskets at the Daringkhola site

Gabion and stone masonry are widely used where flexible protection, local stone, drainage, and practical hill-site construction are required.

Published by: Jwala Nirman Sewa

Practical context: construction execution, measurement, BOQ and infrastructure-work experience in Nepal.

Selecting the right system

Gabions tolerate some settlement and drain freely. Mortared stone masonry provides a rigid wall or drain lining but needs a suitable foundation, drainage provision, bonding, and curing.

Site quality checklist

Confirm excavation level, foundation condition, basket size and wire specification, lacing, diaphragms, stone size, packing, batter, weep holes, mortar proportion, and joint finish.

Note: Actual work should follow the signed contract, approved drawings, BOQ, specifications, authorized engineer’s instructions, and applicable public-procurement and safety requirements.

Frequently Asked Questions

Are gabion walls waterproof?

No. Their permeability is often an advantage because it reduces water pressure, but filters and erosion protection may still be required.

How are gabions measured?

Measurement normally follows the BOQ and specification, commonly by completed volume, with basket and stone requirements verified.

Related Resources

Related Resources

Road & Infrastructure

Road Construction in Pokhara and Gandaki Province

Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.

Read guide
Road & Infrastructure

Irrigation Canal Upgradation Works in Nepal

Planning and execution of canal upgradation in Nepal, including flow diversion, excavation, lining, structural repair, outlets, measurement, and QA/QC.

Read guide
Road & Infrastructure

Road Upgrading Process: Excavation, Sub-base, Drainage and Bitumen Works

A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.

Read guide
Road & Infrastructure

Landslide Clearance and Hill Road Protection Works in Nepal

Safe planning for landslide clearance, roadway excavation, spoil management, drainage, gabion, masonry, and slope protection on Nepal hill roads.

Read guide
Construction Materials & Prices

How Contractors Manage Price Rise in Bitumen, Fuel and Construction Materials

How contractors plan procurement, records, cash flow, rate exposure, and contract compliance when bitumen, fuel, cement, steel, and aggregates rise in price.

Read guide
BOQ / Billing / Contracts

BOQ, Measurement and Final Bill Process in Nepal Construction Contracts

A practical overview of BOQ items, joint measurement, running bills, variations, as-built records, reconciliation, and final bill preparation in Nepal.

Read guide