Prime coat completed during road upgrading work at Jaldhare

Construction Capability

Transport Infrastructure

Road Construction & Upgrading

Rural and urban road formation, drainage, sub-base, base course, bitumen-related works, and finishing.

Service Overview

Road delivery is planned as a coordinated sequence of survey control, excavation, drainage, protection structures, pavement layers, compaction, bitumen-related work, and finishing under the applicable BOQ and specification.

Key Capabilities

  • Road widening and formation
  • Rural and municipal road upgrading
  • Sub-grade, sub-base, and base preparation
  • Premix and bitumen-related finishing

Typical Work Components

  • Setting out and chainage control
  • Earthwork, cutting, filling, and compaction
  • Side drains and cross-drainage
  • Masonry, retaining, and road-safety items

Work Process

Work Process

A typical workflow adapted to site conditions and contract requirements.

  1. 01

    Review drawings, BOQ, alignment, and site access

  2. 02

    Complete drainage and protection alongside formation work

  3. 03

    Prepare and approve each pavement layer before covering

  4. 04

    Measure, document, finish, and hand over the completed reach

Quality & Safety Approach

Line, level, layer thickness, moisture, compaction, drainage fall, material source, bitumen application, traffic control, PPE, and work-zone records are checked against project requirements.

Real Site Work

Capability Gallery

Site photographs from related road, masonry, excavation, and equipment-backed work.

Pavement sample held in a caliper for a thickness measurement
Road site during prime-coat application at Jaldhare
Premix carpet road work at Jaldhare
Rigid pavement construction at Sangamchowk

Related Projects

Related Projects

Current and completed work examples connected to this capability.

Upgrading of Darlingkhola Majhkhet to Baspata Khahare Hudai Darling Road and Sadiban Upallachaur Tallachaur Hudai Koralibang Besi Sombhar Road

Upgrading of Darlingkhola Majhkhet to Baspata Khahare Hudai Darling Road and Sadiban Upallachaur Tallachaur Hudai Koralibang Besi Sombhar Road

Badigad RM-09 and Tamankhola RM-02, Baglung

Project details
Upgrading of Road from 3 No. Barrack Gate to Soto Chowk and Milijuli Marga Upallo Kadeni, PMC-26

Upgrading of Road from 3 No. Barrack Gate to Soto Chowk and Milijuli Marga Upallo Kadeni, PMC-26

Pokhara-26, Kaski

Project details
Sangamchowk Hariyali Tole Road Construction, Pokhara-17 and Jaldhare Thum Road Remaining Section, Pokhara-26

Sangamchowk Hariyali Tole Road Construction, Pokhara-17 and Jaldhare Thum Road Remaining Section, Pokhara-26

Pokhara-17 and Pokhara-26, Kaski

Project details

Related Resources & Guides

Related Resources & Guides

Road Construction in Pokhara and Gandaki Province

Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.

Read resource

Road Upgrading Process: Excavation, Sub-base, Drainage and Bitumen Works

A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.

Read resource

Quality Control Checklist for Road and Structural Works

A practical QA/QC checklist for earthworks, sub-grade, sub-base, drainage, masonry, gabion, concrete, reinforcement, bitumen, records, and handover.

Read resource

Frequently Asked Questions

Frequently Asked Questions

What information is needed before road work planning?

Location, access, drawings, BOQ, alignment, approximate quantities, drainage conditions, timeline, and any traffic or disposal constraints are useful.

Do you handle both earthwork and pavement-related items?

Yes, where included in the agreed scope, work can cover formation, drainage, pavement layers, protection structures, and bitumen-related finishing.

Infrastructure construction project discussion in Nepal