PCC and stone foundation work for roadside protection

Construction Capability

Water & Road Protection

Drainage & Protection Works

Side drains, cross-drainage, culverts, outlets, slope protection, erosion control, and roadside structures.

Service Overview

Drainage is treated as a primary infrastructure system that protects road layers, structures, slopes, property, and downstream areas from uncontrolled water.

Key Capabilities

  • Lined and masonry side drains
  • Cross-drainage and culvert works
  • Catch drains and safe outlets
  • Slope, toe, and erosion protection

Typical Work Components

  • Catchment and flow-path review
  • Excavation, bedding, and line-level control
  • Drain, culvert, inlet, and outlet construction
  • Backfill, protection, and reinstatement

Work Process

Work Process

A typical workflow adapted to site conditions and contract requirements.

  1. 01

    Identify existing and design flow paths

  2. 02

    Prioritize outlets and cross-drainage

  3. 03

    Construct drainage with road or structural sequence

  4. 04

    Test falls, clear obstructions, and record measurements

Quality & Safety Approach

Drain invert, fall, dimensions, bedding, joints, concrete/masonry quality, outlet stability, excavation support, public access, and open-trench protection are controlled.

Real Site Work

Capability Gallery

Site photographs from related road, masonry, excavation, and equipment-backed work.

Open concrete drain beside the access track at Soto Chowk

Related Projects

Related Projects

Current and completed work examples connected to this capability.

Upgrading of Road from 3 No. Barrack Gate to Soto Chowk and Milijuli Marga Upallo Kadeni, PMC-26

Upgrading of Road from 3 No. Barrack Gate to Soto Chowk and Milijuli Marga Upallo Kadeni, PMC-26

Pokhara-26, Kaski

Project details
Sangamchowk Hariyali Tole Road Construction, Pokhara-17 and Jaldhare Thum Road Remaining Section, Pokhara-26

Sangamchowk Hariyali Tole Road Construction, Pokhara-17 and Jaldhare Thum Road Remaining Section, Pokhara-26

Pokhara-17 and Pokhara-26, Kaski

Project details

Related Resources & Guides

Related Resources & Guides

Road Upgrading Process: Excavation, Sub-base, Drainage and Bitumen Works

A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.

Read resource

Quality Control Checklist for Road and Structural Works

A practical QA/QC checklist for earthworks, sub-grade, sub-base, drainage, masonry, gabion, concrete, reinforcement, bitumen, records, and handover.

Read resource

Frequently Asked Questions

Frequently Asked Questions

Why should drainage be completed early in road work?

Functional drainage reduces saturation and erosion before pavement layers and protection works are exposed to runoff.

Can an outlet discharge anywhere convenient?

No. Outlet location and protection should follow design, land and downstream conditions, erosion risk, and responsible approvals.

Infrastructure construction project discussion in Nepal

Project & Equipment Inquiry

Discuss Your Infrastructure Project

Share the location, scope, drawings or BOQ, access conditions, expected timeline, and equipment requirements. We will review the practical execution needs.