Construction Glossary for Nepal: Field, Material and Contract Terms
Plain-language definitions of construction, measurement and contract terms, linked to practical tools and deeper guides.
Use this glossary to read drawings, quotations and site records more clearly. Definitions explain concepts; the approved design, specification and signed contract determine the requirements for your work.
Published by: Jwala Nirman Sewa
Practical context: construction execution, measurement, BOQ and infrastructure-work experience in Nepal.
Editorial review:
BOQ
A bill of quantities lists measured work items, units and quantities for pricing and administration.
PCC
Plain cement concrete is concrete without structural reinforcement specified as part of the element; use the drawing and mix requirements.
RCC
Reinforced cement concrete combines concrete and designed reinforcement; its dimensions and steel detailing come from the structural design.
OPC / PPC
Ordinary Portland Cement and Portland Pozzolana Cement are cement types. Select the specified type rather than treating the names as interchangeable grades.
WMM / GSB
Wet Mix Macadam and Granular Sub-Base identify pavement materials/layers. Their grading, thickness and acceptance follow the project specification.
DBM / Premix Carpet
Dense Bituminous Macadam and premix carpet are distinct bituminous pavement items. Do not transfer a mix design or thickness assumption between them without the specification.
Prime Coat / Tack Coat
Prime treatment prepares a specified granular surface; tack treatment supports bonding between specified pavement surfaces. Application materials and rates are project-specific.
Camber
Camber describes a roadway’s transverse profile, often used to shed surface water. The required geometry comes from the design.
Chainage
Chainage expresses distance along a defined alignment from a reference origin. 1+250 denotes 1,250 m where metres are the adopted convention.
Formation Width
Formation width is the designed width of the prepared road formation; it is not automatically the paved carriageway width.
Subgrade
Subgrade is the prepared ground supporting the pavement structure. Required levels and acceptance checks are specified for the project.
Backfill / Embankment
Backfill replaces or fills space around works; embankment builds ground above existing level. Suitability and compaction must be specified for the intended use.
Gabion
A gabion is a basket filled with suitable stone, used in specified protection or retaining works. Basket material, assembly and foundation are part of the design.
Weep Hole
A weep hole is a designed drainage opening through a wall. It must work with the intended filter, backfill and discharge arrangement.
Retention
Retention is money withheld under an agreed contract mechanism. The amount and release conditions depend on the signed contract and applicable requirements.
TDS / VAT
Tax deducted at source and value added tax are different tax concepts. Confirm the current applicable treatment with authoritative guidance; calculator inputs do not establish tax liability.
Running Bill
An interim claim for measured work during execution, reconciled with prior certified amounts and applicable deductions under the contract.
Variation
A change administered through the contract’s instruction, valuation and approval procedure. A site conversation alone may not establish an authorized variation.
Provisional Sum / PS Item
An allowance for work or expenditure to be instructed or defined under the contract. It is not automatically the contractor’s earned amount.
Daywork
A contract valuation arrangement using recorded resources such as labour, plant and materials, subject to the agreed rules and authorization.
Performance Security / Bid Security
Performance security supports contract performance obligations; bid security relates to bidding obligations. Required form, amount and validity come from the applicable documents.
Liquidated Damages
A contract mechanism for specified consequences of delay or another defined breach. Applicable limits and conditions require the actual contract and legal context.
Defect Liability Period
The contract-defined period and process for addressing covered defects. Its start, duration and obligations must be read from the actual agreement.
Note: Actual work should follow the signed contract, approved drawings, BOQ, specifications, authorized engineer’s instructions, and applicable public-procurement and safety requirements.
Frequently Asked Questions
Do these definitions replace my contract?
No. Check the definitions, conditions and current authoritative requirements that apply to your project.
Related Resources
Related Resources
Road Construction in Pokhara and Gandaki Province
Practical guidance on road construction in Pokhara and Gandaki: survey, excavation, drainage, sub-base, bitumen, QA/QC, and hill-terrain planning.
Read guideGabion Wall and Stone Masonry Works in Nepal
How gabion and stone masonry works are planned, constructed, measured, and quality-checked for roads, slopes, drains, and river protection in Nepal.
Read guideIrrigation Canal Upgradation Works in Nepal
Planning and execution of canal upgradation in Nepal, including flow diversion, excavation, lining, structural repair, outlets, measurement, and QA/QC.
Read guideRoad Upgrading Process: Excavation, Sub-base, Drainage and Bitumen Works
A stage-by-stage road upgrading guide covering excavation, formation, drainage, sub-grade, sub-base, compaction, bitumen works, measurement, and quality control.
Read guideLandslide Clearance and Hill Road Protection Works in Nepal
Safe planning for landslide clearance, roadway excavation, spoil management, drainage, gabion, masonry, and slope protection on Nepal hill roads.
Read guideHow Contractors Manage Price Rise in Bitumen, Fuel and Construction Materials
How contractors plan procurement, records, cash flow, rate exposure, and contract compliance when bitumen, fuel, cement, steel, and aggregates rise in price.
Read guide