नेपालभर सम्पन्न परियोजनाहरू
दुई दशकभन्दा बढी समयदेखि नेपालका विभिन्न भौगोलिक क्षेत्रमा सडक, नदी नियन्त्रण, पुल, खानेपानी तथा सार्वजनिक पूर्वाधार परियोजनाहरू सफलतापूर्वक सम्पन्न गर्दै।
सरकारी निकाय र समुदायहरूको विश्वास
प्रमुख परियोजनाहरू
सम्पन्न परियोजनाहरू
सम्पन्नUpgrading of Vijayapur Majhathana Begnas Road, PMC 26-28-31 Package-1
Widening, paving, and drainage work for safe and durable roadway. Earthworks 2 km, 6 m wide pavement, retaining walls included.
सम्पन्नUpgrading of Vijayapur Majhathana Begnas Road, PMC 26-28-31 Package-2
Widening, paving, and drainage work for safe and durable roadway. Earthworks 2 km, 6 m wide pavement, retaining walls included.
सम्पन्नUpgrading of Vijayapur Majhathana Begnas Road, PMC 26-28-31 Package-3
Widening, paving, and drainage work for safe and durable roadway. Earthworks 2 km, 6 m wide pavement, retaining walls included.
सम्पन्नArmy Camp Building Construction
Constructed multi-story administrative building with reinforced concrete and modern facilities.
सम्पन्नLekhnath Drinking Water Pipeline
Installed HDPE and PVC pipelines, pump stations upgraded, providing clean drinking water to multiple wards.
सम्पन्नFishery Research Station Repair Works
Renovation, drainage improvement, lab setup, and building repairs completed successfully.
सम्पन्नVijaypur–Silinge Road Construction
Rural road construction including gravel sub-base, asphalt surfacing, and roadside drainage for resilient infrastructure.
सम्पन्नUpgrading of Kolchowk-Ratopani-Bhalavot- Panpatechautari-Gaupalika kendra-Jogichaur-Patikhola-Bhindabari-Gairagau-Dhital-Dhampus Deurali Road
Upgraded rural road with proper drainage, pavement, retaining walls, and gabion.
सम्पन्नSuspension Bridge Construction at Mijure
Steel truss bridge connecting remote villages, including abutments, foundations, and approaches.
सम्पन्नUrban Drainage Improvement, Pokhara-14
Installed reinforced concrete drains, culverts, and slope protection works improving urban infrastructure.
सम्पन्नSuikhet Khola River Training Works, Pokhara-25, Kaski
River training works at Suikhet Khola involving hand-woven gabion wall construction and embankment filling using RBM (river bed materials) to ensure effective erosion control and riverbank stabilization.
सम्पन्नSanti Marga Bhitribato Street No.1 Sadak,Pokhara 26
Stone masonry drainage construction, premix bitumen road works, and road markings for improved urban mobility.
सम्पन्नConstruction of Fulpu Playground at Ghanapokhara Marsyangdi Rural Municipality
Excavation and site development for Fulpu Playground, including soil and hard ground cutting, leveling, and gabion wall construction.
निर्माणाधीन परियोजनाहरू
निर्माणाधीनConstruction of Community Center, Gorkha
Building multipurpose center with classrooms, hall, and sanitation facilities.
निर्माणाधीनRural School Renovation, Lamjung
Renovation of classrooms, roofs, and playgrounds for safer and improved learning environment.

पूर्वाधार तथा विकास
दीर्घकालीन पूर्वाधार निर्माण।
परियोजनाको स्कोप, टाइमलाइन, साइट अवस्था र आवश्यक उपकरणबारे जानकारी पठाउनुहोस्। हाम्रो टिमले छिट्टै स्पष्ट योजना र कोटेसनसहित जवाफ दिन्छ।